Home / Cities and public spaces / Tender specification
Smart city video analytics tender specification for agencies and integrators.
This smart city video analytics tender specification gives vendor-neutral clauses to copy into a bid.

Functional requirements
| Clause | Requirement | Specification |
|---|---|---|
| R1 | Camera input | Works with existing IP cameras over RTSP and ONVIF, directly or through the agency's VMS or NVR, with no camera replacement. |
| R2 | Use cases | Detects the use cases listed in Annex A, each switched on per camera and per time of day. |
| R3 | Alerts | Alerts named roles by mobile app, SMS, Microsoft Teams, email, dashboard and API, with the clip and camera. At the 95th percentile, an alert arrives within seconds of the event. |
| R4 | Escalation | Escalates unacknowledged alerts on a schedule the agency sets per case type. |
| R5 | Case routing | Creates a case for each event and routes it to the team or contractor that owns the place and issue, by API into the work-order system. |
Closure and record requirements
| Clause | Requirement | Specification |
|---|---|---|
| R6 | Case closure | Re-checks the same camera view and closes the case only when it shows the issue resolved, storing the closing photo. |
| R7 | Privacy | Performs no biometric identification and stores no face templates. Exports blur faces and plates by default; only an authorised role can export unblurred, with the purpose logged under R9. |
| R8 | Reporting | Produces weekly reports per contractor with cases raised, closed on camera and days to close, approved by an officer. |
| R9 | Audit | Logs every view, search and export with user, time and purpose. |
| R10 | Resilience | Detection, recording and on-site alerts continue through a network outage, and remote alerts send when the link returns. |
Deployment options
Bidders price all three options.
| Option | Where processing runs | Fits |
|---|---|---|
| On premises | Servers in the agency's data centre | Sovereign data, large camera counts |
| Edge | Small servers near camera clusters | Limited network links, remote sites |
| In-country cloud | A partner's government-approved cloud | Fast start, opex budgets |
Data handling
| Topic | Clause |
|---|---|
| Data location | Video and case data stay in-country, on infrastructure the agency approves. |
| Retention | The agency sets retention per data type; case clips are deleted when it expires. |
| Access | Role-based by area and camera; contractors see their own cases only. |
| Encryption | Encrypted in transit (TLS 1.2 or higher) and at rest (AES-256). |
| Law | The bidder complies with the agency's data law, such as Singapore's PSGA or Saudi Arabia's PDPL. |
Acceptance tests
Every test runs on the agency's own cameras or footage. The agency sets each value marked before the tender is issued.
| Test | Name | Method | Pass condition |
|---|---|---|---|
| T1 | Detection on agency footage | Bidder runs on 20 hours of agency footage with events pre-counted by the agency. | For each Annex A use case, recall of at least % and at most false alerts per camera per day |
| T2 | Alert time | staged events on three live cameras. | At the 95th percentile, the named role receives the alert within seconds of the staged event |
| T3 | Case closure | Staged event cleared on camera. | Case closes with the photo from the same camera |
| T4 | Offline operation | Link to the dashboard cut for 2 hours. | Behaves as clause R10, with no events lost and the alert backlog delivered within minutes of the link returning |
| T5 | Privacy | Five clips with people and vehicles exported by a standard user and the authorised role. | Standard exports blurred; only the authorised role exports unblurred; every export logged with its purpose |
Annex A use cases
The agency sets each marked value and deletes unused rows.
| Use case | Event definition | Conditions | Closure condition |
|---|---|---|---|
| Traffic incidents | Vehicle stopped in a live lane or keep-clear box over seconds, or debris in a lane | Day and night | Lane clear |
| Illegal parking | Vehicle in a no-parking zone, bus lane or loading bay over minutes | Hours set per zone | Zone clear |
| Crowd density | Over people per m² in a marked area for minutes | No identification | Density below the level |
| Public safety | Person on the ground over seconds, or entry to a closed area | Hours set per zone | Officer closes with a note |
| Illegal dumping | Waste of m² or more outside a bin point over minutes | Hotspots drawn per camera | Area clear |
Annex A use cases, continued
| Use case | Event definition | Conditions | Closure condition |
|---|---|---|---|
| Overflowing bins | Waste above the rim or beside a bin point over minutes | Bin points drawn per camera | Bin point clear |
| Drains and flooding | Standing water over % of a marked area for minutes | Day, night and rain | Water gone |
| Road damage | Pothole or crack cm or more across, or a works barrier down | Daylight | Repair shown |
| Visual pollution | Graffiti, fly-posting or abandoned items over m² | Daylight | Item removed |
| Parks | Closed area entered after hours, litter or a damaged fixture | Hours set per area | Area clear or fixture repaired |
Revisions
| Version | Date | Change |
|---|---|---|
| 1.0 | 7 Nov 2026 | First issue. |
| 1.1 | 8 Nov 2026 | Pass values in R3, T1, T2 and T4; export blur in R7 and T5. |
| 1.2 | 8 Nov 2026 | Annex A definitions; Annex B background. |
Annex B background for the agency
The agency removes this sourced context before the tender is issued.
Saudi government tenders can weight local content in the financial evaluation, and supply and support through an in-Kingdom integrator count toward it.
Source: Saudipedia, May 2023Under Singapore's January 2026 Public Sector (Governance) Act amendments, external partners receiving shared government data take on duties equivalent to agencies.
Source: Hogan LovellsSaudi Arabia's Personal Data Protection Law has been enforceable since September 2024, with SDAIA as regulator.
Source: Clyde & Co
Bid support for agencies and integrators
Partners get the architecture diagram, data sheet and a footage review for each bid.